CHAPARRAL Well Details
Texas Wells · Andrews County · SHAFTER LAKE, N. (SAN ANDRES) field · PARALLEL PETROLEUM LLC
API No.
Latest Permit
Spud Date
Latest Completion
CHAPARRAL (API 00347521) is operated by PARALLEL PETROLEUM LLC and sits in the SHAFTER LAKE, N. (SAN ANDRES) oil & gas field of Andrews County, Texas.
Surface location: 32.5176, -102.5923
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,424,830 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-06-18
→ 2017-06-21 |
Parallel Petroleum LLC | 5,145 | 4,632 | 1,424,830 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-10-31 | Administrative re-save | PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2024-08-23 |
New permit 2024-08-23 Completion 2024-07-15 |
PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2017-08-22 | Administrative re-save | PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2017-08-05 |
Initial filing Permit: 2017-08-05 Spud: 2017-05-14 Completion: 2017-07-07 |
PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |