TEXAS TEA Well Details
Texas Wells · Andrews County · SHAFTER LAKE, N. (SAN ANDRES) field · PARALLEL PETROLEUM LLC
API No.
Latest Permit
Spud Date
Latest Completion
TEXAS TEA (API 00347821) is operated by PARALLEL PETROLEUM LLC and sits in the SHAFTER LAKE, N. (SAN ANDRES) oil & gas field of Andrews County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,632,545 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-07-26
→ 2018-07-31 |
Parallel Petroleum LLC | 5,663 | 5,824 | 1,632,545 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-07-25 | Administrative re-save | PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2025-06-12 |
New permit 2025-06-12 Completion 2025-04-18 Type → Producing |
PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2020-03-16 | Administrative re-save | PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Shut-In Producer / Horizontal |
| 2019-11-21 |
New permit 2019-11-21 Completion 2019-10-15 Type → Shut-In Producer |
PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Shut-In Producer / Horizontal |
| 2019-11-13 | Administrative re-save | PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2019-08-20 |
New permit 2019-08-20 Completion 2018-10-15 |
PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |
| 2018-12-20 |
Initial filing Permit: 2018-10-19 Spud: 2018-06-18 Completion: 2018-08-16 |
PARALLEL PETROLEUM LLC | SHAFTER LAKE, N. (SAN ANDRES) | Producing / Horizontal |