EDWARDS ESTATE STATE Well Details
Texas Wells · Crane County · EDWARDS -04- (DEV) field · BAM PERMIAN OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
EDWARDS ESTATE STATE (API 10336590) is operated by BAM PERMIAN OPERATING, LLC and sits in the EDWARDS -04- (DEV) oil & gas field of Crane County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (1,594,530 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2019-06-29 | BAM Permian Operating, LLC | — | 9,390 | 823,998 | — |
|
2018-02-27
→ 2018-03-02 |
BAM Permian Operating, LLC | — | 11,000 | 770,532 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-03-23 | Administrative re-save | BAM PERMIAN OPERATING, LLC | EDWARDS -04- (DEV) | Producing / Vertical |
| 2020-02-03 |
New permit 2020-02-03 Completion 2020-01-31 Field → EDWARDS -04- (DEV) |
BAM PERMIAN OPERATING, LLC | EDWARDS -04- (DEV) | Producing / Vertical |
| 2020-01-09 | Administrative re-save | BAM PERMIAN OPERATING, LLC | EDWARDS -04- (STRAWN) | Producing / Vertical |
| 2019-10-14 |
New permit 2019-10-14 Completion 2019-08-29 Field → EDWARDS -04- (STRAWN) |
BAM PERMIAN OPERATING, LLC | EDWARDS -04- (STRAWN) | Producing / Vertical |
| 2018-04-18 | Administrative re-save | BAM PERMIAN OPERATING, LLC | EDWARDS -04- (DEV) | Producing / Vertical |
| 2018-03-27 |
Initial filing Permit: 2018-03-27 Spud: 2017-11-28 Completion: 2018-03-13 |
BAM PERMIAN OPERATING, LLC | EDWARDS -04- (DEV) | Producing / Vertical |