WADDELL TR 1 Well Details
Texas Wells · Crane County · BLOCK 31, NW. (PENN UPPER) field · BLACKBEARD OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
WADDELL TR 1 (API 10336995) is operated by BLACKBEARD OPERATING, LLC and sits in the BLOCK 31, NW. (PENN UPPER) oil & gas field of Crane County, Texas.
Surface location: 31.6190, -102.5388
FracFocus Records 3 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (1,240,660 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2023-02-07 | Blackbeard Operating | — | 9,040 | 304,298 | — |
| 2022-11-17 | Blackbeard Operating | — | 9,040 | 481,906 | — |
| 2022-09-22 | Blackbeard Operating | — | 3,720 | 454,456 | — |
Update History (12 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-10-09 | Administrative re-save | BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2025-08-27 |
New permit 2025-08-27 Completion 2025-08-05 |
BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2025-07-15 |
Completion 2025-04-04 |
BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2025-07-14 |
Completion 2023-10-30 |
BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2025-06-12 |
Completion 2025-04-04 |
BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2025-06-12 |
New permit 2025-06-12 Completion 2023-10-30 |
BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2023-10-11 | Field → BLOCK 31, NW. (PENN UPPER) | BLACKBEARD OPERATING, LLC | BLOCK 31, NW. (PENN UPPER) | Producing / Vertical |
| 2023-07-07 |
New permit 2023-07-07 Completion 2023-02-19 Field → WADDELL (PENN., UPPER) |
BLACKBEARD OPERATING, LLC | WADDELL (PENN., UPPER) | Producing / Vertical |
| 2023-03-17 |
New permit 2022-12-13 Spudded 2022-09-22 Completion 2022-09-23 Field → UNIVERSITY WADDELL (DEVONIAN) |
BLACKBEARD OPERATING, LLC | UNIVERSITY WADDELL (DEVONIAN) | Producing / Vertical |
| 2023-01-23 |
New permit 2022-11-16 Spudded 2022-06-23 Completion 2022-07-30 Field → WADDELL (SILURIAN) |
BLACKBEARD OPERATING, LLC | WADDELL (SILURIAN) | Producing / Vertical |
| 2022-12-13 |
New permit 2022-12-13 Spudded 2022-09-22 Completion 2022-09-23 Field → WADDELL (DEVONIAN) |
BLACKBEARD OPERATING, LLC | WADDELL (DEVONIAN) | Producing / Vertical |
| 2022-11-16 |
Initial filing Permit: 2022-11-16 Spud: 2022-06-23 Completion: 2022-07-30 |
BLACKBEARD OPERATING, LLC | WADDELL (SILURIAN) | Producing / Vertical |