PARKER MINERALS 4 Well Details
Texas Wells · Ector County · GOLDSMITH field · not found
API No.
Latest Permit
Spud Date
Latest Completion
PARKER MINERALS 4 (API 13543109) is operated by not found and sits in the GOLDSMITH oil & gas field of Ector County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,398,684 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-11-03
→ 2014-11-04 |
Sheridan Production Company, LLC | 2,085 | 7,000 | 1,398,684 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-07-14 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2025-06-17 |
New permit 2025-06-17 Completion 2025-02-19 |
not found | GOLDSMITH | Producing / Horizontal |
| 2024-09-09 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2024-06-17 |
New permit 2024-06-17 Spudded 2014-10-02 Completion 2024-04-11 Operator → not found |
not found | GOLDSMITH | Producing / Horizontal |
| 2015-09-15 | Administrative re-save | SHERIDAN PRODUCTION COMPANY, LLC | GOLDSMITH | Producing / Horizontal |
| 2015-06-04 |
Initial filing Permit: 2015-06-04 Spud: 2014-09-25 Completion: 2014-11-09 |
SHERIDAN PRODUCTION COMPANY, LLC | GOLDSMITH | Producing / Horizontal |