SWEET MELISSA Well Details
Texas Wells · Ector County · NOVO (MISSISSIPPIAN) field · ARES ENERGY, LTD.
API No.
Latest Permit
Spud Date
Latest Completion
SWEET MELISSA (API 13543903) is operated by ARES ENERGY, LTD. and sits in the NOVO (MISSISSIPPIAN) oil & gas field of Ector County, Texas.
Surface location: 31.0000, -102.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (25,613,700 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-12-18
→ 2023-01-03 |
Ares Energy Ltd | 11,204 | 11,595 | 25,613,700 | — |
Update History (10 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-01-13 | Administrative re-save | ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2025-12-17 |
New permit 2025-12-17 |
ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2025-07-01 | Administrative re-save | ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2025-06-03 |
New permit 2025-06-03 |
ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2024-03-04 | Administrative re-save | ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2023-12-19 |
New permit 2023-12-19 |
ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2023-09-07 | Administrative re-save | ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2023-08-10 |
New permit 2023-08-10 |
ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2023-06-06 | Administrative re-save | ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |
| 2023-04-18 |
Initial filing Permit: 2023-04-18 Spud: 2022-08-26 Completion: 2023-01-18 |
ARES ENERGY, LTD. | NOVO (MISSISSIPPIAN) | Producing / Horizontal |