JBL Well Details
Texas Wells · Glasscock County · SPRABERRY (TREND AREA) field · TRILOGY OPERATING, INC.
API No.
Latest Permit
Spud Date
Latest Completion
JBL (API 17335000) is operated by TRILOGY OPERATING, INC. and sits in the SPRABERRY (TREND AREA) oil & gas field of Glasscock County, Texas.
Surface location: 32.0000, -101.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (112,644 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2024-08-07 | Trilogy Operating, Inc. | — | 8,327 | 112,644 | — |
Update History (11 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-01-08 | Administrative re-save | TRILOGY OPERATING, INC. | SPRABERRY (TREND AREA) | Producing / Vertical |
| 2024-10-10 |
New permit 2024-10-10 Completion 2024-08-31 Field → SPRABERRY (TREND AREA) |
TRILOGY OPERATING, INC. | SPRABERRY (TREND AREA) | Producing / Vertical |
| 2024-09-30 | Administrative re-save | TRILOGY OPERATING, INC. | JAILHOUSE (FUSSELMAN) | Producing / Vertical |
| 2024-06-17 |
New permit 2024-06-17 Completion 2024-06-06 |
TRILOGY OPERATING, INC. | JAILHOUSE (FUSSELMAN) | Producing / Vertical |
| 2024-03-13 | Administrative re-save | TRILOGY OPERATING, INC. | JAILHOUSE (FUSSELMAN) | Producing / Vertical |
| 2024-01-11 |
New permit 2024-01-11 Completion 2023-12-17 |
TRILOGY OPERATING, INC. | JAILHOUSE (FUSSELMAN) | Producing / Vertical |
| 2019-05-20 |
Completion 2014-01-27 |
TRILOGY OPERATING, INC. | JAILHOUSE (FUSSELMAN) | Producing / Vertical |
| 2019-05-02 |
New permit 2019-05-02 Completion 2012-08-08 Field → JAILHOUSE (FUSSELMAN) |
TRILOGY OPERATING, INC. | JAILHOUSE (FUSSELMAN) | Producing / Vertical |
| 2019-04-05 | Administrative re-save | TRILOGY OPERATING, INC. | DEADWOOD (FUSSELMAN) | Producing / Vertical |
| 2019-03-27 |
New permit 2019-03-27 Spudded 2012-06-27 Completion 2014-01-27 |
TRILOGY OPERATING, INC. | DEADWOOD (FUSSELMAN) | Producing / Vertical |
| 2013-08-20 |
Initial filing Permit: 2012-08-30 Completion: 2012-08-08 |
TRILOGY OPERATING, INC. | DEADWOOD (FUSSELMAN) | Producing / Vertical |