DUKE SWD Well Details
Texas Wells · Lipscomb County · CAMBRIDGE (ATOKA) field · OVERFLOW ENERGY, LLC
API No.
Latest Permit
Spud Date
Latest Completion
DUKE SWD (API 29531317) is operated by OVERFLOW ENERGY, LLC and sits in the CAMBRIDGE (ATOKA) oil & gas field of Lipscomb County, Texas.
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-09-30 | Administrative re-save | OVERFLOW ENERGY, LLC | CAMBRIDGE (ATOKA) | Active UIC / Vertical |
| 2025-09-29 |
New permit 2025-09-29 Spudded 2016-06-03 Completion 2016-07-22 Operator → OVERFLOW ENERGY, LLC |
OVERFLOW ENERGY, LLC | CAMBRIDGE (ATOKA) | Active UIC / Vertical |
| 2017-02-01 |
New permit 2016-12-13 Spudded 2016-10-28 Completion 2016-10-28 Operator → INTEGRITY H2O LLC |
INTEGRITY H2O LLC | CAMBRIDGE (ATOKA) | Active UIC / Vertical |
| 2016-12-14 |
New permit 2016-07-26 Spudded 2016-06-03 Completion 2016-07-22 Operator → OVERFLOW ENERGY, LLC |
OVERFLOW ENERGY, LLC | CAMBRIDGE (ATOKA) | Active UIC / Vertical |
| 2016-12-13 |
New permit 2016-12-13 Spudded 2016-10-28 Completion 2016-10-28 Operator → INTEGRITY H2O LLC |
INTEGRITY H2O LLC | CAMBRIDGE (ATOKA) | Active UIC / Vertical |
| 2016-07-26 |
Initial filing Permit: 2016-07-26 Spud: 2016-06-03 Completion: 2016-07-22 |
OVERFLOW ENERGY, LLC | CAMBRIDGE (ATOKA) | Active UIC / Vertical |