TOPPER SWD Well Details
Texas Wells · Loving County · EL MAR (DELAWARE) field · SOLARIS WATER MIDSTREAM, LLC
API No.
Latest Permit
Spud Date
Latest Completion
TOPPER SWD (API 30136177) is operated by SOLARIS WATER MIDSTREAM, LLC and sits in the EL MAR (DELAWARE) oil & gas field of Loving County, Texas.
Surface location: 31.9881, -103.6011
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-07-01 |
Spudded 2023-04-01 |
SOLARIS WATER MIDSTREAM, LLC | EL MAR (DELAWARE) | Active UIC / Vertical |
| 2025-06-05 |
New permit 2025-06-05 Spudded 2025-05-14 Completion 2025-05-14 |
SOLARIS WATER MIDSTREAM, LLC | EL MAR (DELAWARE) | Active UIC / Vertical |
| 2023-09-18 | Administrative re-save | SOLARIS WATER MIDSTREAM, LLC | EL MAR (DELAWARE) | Active UIC / Vertical |
| 2023-05-16 |
Initial filing Permit: 2023-05-16 Spud: 2023-04-02 Completion: 2023-04-12 |
SOLARIS WATER MIDSTREAM, LLC | EL MAR (DELAWARE) | Active UIC / Vertical |