AERY Well Details
Texas Wells · McMullen County · EAGLEVILLE (EAGLE FORD-1) field · REPSOL OIL & GAS USA, LLC
API No.
Latest Permit
Spud Date
Latest Completion
AERY (API 31135120) is operated by REPSOL OIL & GAS USA, LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of McMullen County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (10,343,340 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-05-27
→ 2022-06-10 |
Repsol O&G, LLC. | 7,743 | 11,311 | 5,297,418 | — |
| 2013-03-20 | Talisman Energy USA Inc. | 7,743 | 11,346 | 5,045,922 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-03-25 | Administrative re-save | REPSOL OIL & GAS USA, LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2026-03-02 |
New permit 2026-03-02 |
REPSOL OIL & GAS USA, LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2023-06-08 | Administrative re-save | REPSOL OIL & GAS USA, LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2023-03-27 |
New permit 2023-03-27 Spudded 2022-06-06 Completion 2022-07-01 Operator → REPSOL OIL & GAS USA, LLC |
REPSOL OIL & GAS USA, LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-01-11 |
New permit 2013-11-13 Completion 2013-05-31 |
TALISMAN ENERGY USA INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-07-31 |
Initial filing Permit: 2013-04-22 Completion: 2013-04-01 |
TALISMAN ENERGY USA INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |