MACKEREL Well Details
Texas Wells · Milam County · GIDDINGS (BUDA) field · BUFFCO PRODUCTION INC.
API No.
Latest Permit
Spud Date
Latest Completion
MACKEREL (API 33134402) is operated by BUFFCO PRODUCTION INC. and sits in the GIDDINGS (BUDA) oil & gas field of Milam County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,288,224 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-01-17 | XTO Energy/ExxonMobil | 4,306 | 6,228 | 1,288,224 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-01-12 | Administrative re-save | BUFFCO PRODUCTION INC. | GIDDINGS (BUDA) | Producing / Horizontal |
| 2025-09-03 |
New permit 2025-09-03 Completion 2025-08-14 |
BUFFCO PRODUCTION INC. | GIDDINGS (BUDA) | Producing / Horizontal |
| 2020-04-01 | Administrative re-save | BUFFCO PRODUCTION INC. | GIDDINGS (BUDA) | Producing / Horizontal |
| 2019-11-26 |
New permit 2019-11-26 Completion 2019-10-24 |
BUFFCO PRODUCTION INC. | GIDDINGS (BUDA) | Producing / Horizontal |
| 2019-07-15 | Administrative re-save | BUFFCO PRODUCTION INC. | GIDDINGS (BUDA) | Producing / Horizontal |
| 2019-05-15 |
New permit 2019-05-15 Spudded 2012-12-01 Completion 2019-02-11 Operator → BUFFCO PRODUCTION INC. |
BUFFCO PRODUCTION INC. | GIDDINGS (BUDA) | Producing / Horizontal |
| 2013-09-09 |
Initial filing Permit: 2013-03-08 Completion: 2013-01-19 |
XTO ENERGY INC. | GIDDINGS (BUDA) | Producing / Horizontal |