WALKER SU E-D ALLOC A Well Details
Texas Wells · Nacogdoches County · CARTHAGE (HAYNESVILLE SHALE) field · EXCO OPERATING COMPANY, LP
API No.
Latest Permit
Spud Date
Latest Completion
WALKER SU E-D ALLOC A (API 34733506) is operated by EXCO OPERATING COMPANY, LP and sits in the CARTHAGE (HAYNESVILLE SHALE) oil & gas field of Nacogdoches County, Texas.
Surface location: 31.3999, -94.3389
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (37,721,544 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2025-02-10
→ 2025-03-05 |
EXCO Resources, Inc. | 10,756 | 14,629 | 37,721,544 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-04-28 | Administrative re-save | EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2025-04-01 |
New permit 2025-04-01 Completion 2025-03-19 Type → Producing |
EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2024-10-08 | Administrative re-save | EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Shut-In Producer / Horizontal |
| 2024-09-11 |
Initial filing Permit: 2024-09-11 Spud: 2024-04-24 Completion: 2024-07-12 |
EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Shut-In Producer / Horizontal |