BLACK STONE-JEBCO Well Details
Texas Wells · Newton County · SABINE TRAM (WILCOX 2) field · UNIT PETROLEUM COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
BLACK STONE-JEBCO (API 35130886) is operated by UNIT PETROLEUM COMPANY and sits in the SABINE TRAM (WILCOX 2) oil & gas field of Newton County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (132,417 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2014-03-17 | Unit Petroleum | — | 11,938 | 132,417 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-08-24 | Field → SABINE TRAM (WILCOX 2) | UNIT PETROLEUM COMPANY | SABINE TRAM (WILCOX 2) | Producing / Vertical |
| 2016-02-17 |
Initial filing Permit: 2016-02-17 Spud: 2013-09-04 Completion: 2013-12-10 |
UNIT PETROLEUM COMPANY | SABINE TRAM (WILCOX 6) | Producing / Vertical |