SEALY SMITH Well Details
Texas Wells · Ward County · WICKETT (PENN.) field · SUNDOWN ENERGY LP
API No.
Latest Permit
Spud Date
Latest Completion
SEALY SMITH (API 47536853) is operated by SUNDOWN ENERGY LP and sits in the WICKETT (PENN.) oil & gas field of Ward County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,054,172 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-01-05
→ 2015-01-06 |
Sundown Energy L.P. | — | 11,000 | 1,054,172 | — |
Update History (9 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-10-13 | Administrative re-save | SUNDOWN ENERGY LP | WICKETT (PENN.) | Active UIC / Vertical |
| 2025-09-30 |
New permit 2025-09-30 Completion 2025-09-11 Operator → SUNDOWN ENERGY LP |
SUNDOWN ENERGY LP | WICKETT (PENN.) | Active UIC / Vertical |
| 2021-01-20 | Administrative re-save | ELAND ENERGY, INC. | WICKETT (PENN.) | Active UIC / Vertical |
| 2020-11-12 |
New permit 2020-11-12 Completion 2020-08-07 Type → Active UIC |
ELAND ENERGY, INC. | WICKETT (PENN.) | Active UIC / Vertical |
| 2017-02-01 |
New permit 2017-01-10 Completion 2015-02-13 Field → WICKETT (PENN.) |
ELAND ENERGY, INC. | WICKETT (PENN.) | Producing / Vertical |
| 2015-12-04 | Administrative re-save | ELAND ENERGY, INC. | WAGON WHEEL (PENN) | Producing / Vertical |
| 2015-11-20 |
New permit 2015-11-20 Completion 2015-11-04 |
ELAND ENERGY, INC. | WAGON WHEEL (PENN) | Producing / Vertical |
| 2015-04-23 | Administrative re-save | ELAND ENERGY, INC. | WAGON WHEEL (PENN) | Producing / Vertical |
| 2015-02-26 |
Initial filing Permit: 2015-02-26 Spud: 2014-11-13 Completion: 2015-02-13 |
ELAND ENERGY, INC. | WAGON WHEEL (PENN) | Producing / Vertical |