UNIVERSITY LANDS 43-20 B Well Details
Texas Wells · Ward County · PHANTOM (WOLFCAMP) field · U.S. ENERGY DEVELOPMENT CORP
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY LANDS 43-20 B (API 47538105) is operated by U.S. ENERGY DEVELOPMENT CORP and sits in the PHANTOM (WOLFCAMP) oil & gas field of Ward County, Texas.
Surface location: 31.6378, -103.3433
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (14,382,228 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2020-12-02
→ 2020-12-21 |
U.S. Energy Development Corp | 9,869 | 12,162 | 14,382,228 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-03-24 | Administrative re-save | U.S. ENERGY DEVELOPMENT CORP | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2025-01-30 |
New permit 2025-01-30 |
U.S. ENERGY DEVELOPMENT CORP | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2021-03-09 | Administrative re-save | U.S. ENERGY DEVELOPMENT CORP | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2021-03-02 |
New permit 2021-03-02 Completion 2021-01-15 Type → Producing |
U.S. ENERGY DEVELOPMENT CORP | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2020-11-02 | Administrative re-save | U.S. ENERGY DEVELOPMENT CORP | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2020-10-20 |
Initial filing Permit: 2020-10-20 Spud: 2020-03-13 Completion: 2020-04-10 |
U.S. ENERGY DEVELOPMENT CORP | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |